Understanding Duty Cycle Before You Buy An Inverter Welder
Cutting capacity is usually described in terms of clean cut and maximum cut thickness, and the two are worth distinguishing. Clean cut is the thickness a machine handles with a good edge finish and reasonable speed, while maximum cut is the thickest material the machine will get through at all, usually slower and with a rougher edge. Buying with your typical material thickness in mind, rather than the thickest job you might occasionally face, generally gives a better day-to-day result.
Portability and power supply matter as much as the process itself. A stick welder will run from a generator or a domestic supply in places a gas bottle can't easily follow, while MIG and TIG set-ups need a gas cylinder and, for anything beyond light-gauge work, a heavier electrical supply. Workshop layout, the materials you weld most often, and how frequently the machine needs to travel are all worth weighing up before settling on one process.
Space and power supply are the other two practical constraints worth checking early. Confirming that a chosen machine will run comfortably from the electrical supply actually available in the workshop, and that there's room to work safely around it with materials laid out, avoids the common mistake of buying a machine that then can't be used the way it was intended.
The practical difference comes down to what a machine can draw and sustain. A single-phase supply has a ceiling on how much continuous power it can deliver before tripping breakers or tec Products overloading domestic wiring, which is why the highest-output welding and cutting equipment is frequently three-phase only, or offers noticeably better duty cycle performance when run on three-phase. For workshops without an existing three-phase supply, bringing one in usually means an electrician and, in some cases, an application to the local distribution network operator.
The abrasive material itself matters as much as the shape. Discs formulated for steel typically contain aluminium oxide, while stainless steel usually calls for an inox-rated disc that's free from iron, sulphur and chlorine contaminants that could otherwise cause surface corrosion on the stainless. Aluminium and other soft, non-ferrous metals need their own dedicated abrasives too, since standard steel discs tend to clog quickly and produce a poor finish on softer materials.
Duty cycle is one of the most misunderstood figures on a welder's spec sheet, yet it tells you more about real-world usability than the headline amperage does. It's expressed as a percentage over a ten-minute period at a given output, so a machine rated at 30% duty cycle at its maximum amperage can run for three minutes out of every ten at that setting before it needs to rest and cool.